Loading... Please wait...

My basket contains:

0 items £0.00

View Basket

£14.99

Add to basket
Price in Euros €18.65
Price in USD $23.66
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

Beijing International Airport: Foster + Partners

Chris Abel, Norman Foster and David Jenkins

  • Format: Book

  • Pages: 96

  • Publisher: Prestel

  • Date Published: Dec 2010

  • Stock Code: 71271

  • ISBN: 9783791343136

  • Binding: Hardback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

Beijing's new international terminal is the world's largest and most advanced airport building - not only technologically, but also in terms of passenger experience, operational efficiency and sustainability. Its soaring aerodynamic roof and dragon-like form celebrate the thrill and poetry of flight and evoke traditional Chinese colours and symbols. The terminal building and Ground Transportation Centre (GTC) enclose a floor area of 1.3 million square meters and will accommodate an estimated 50 million passengers per annum by 2020. Public transport connections are fully integrated, walking distances for passengers are short, with few level changes, and transfer times between flights are minimised. Like Chek Lap Kok, the terminal is open to views to the outside and planned under a single unifying roof canopy, whose linear skylights are both an aid to orientation and sources of daylight - the colour cast changing from red to yellow as passengers progress through the building. The terminal building is one of the world's most sustainable, incorporating a range of passive environmental design concepts, such as the south-east orientated skylights, which maximise heat gain from the early morning sun, and an integrated environment-control system that minimizes energy consumption. In construction terms, its design optimised the performance of materials selected on the basis of local availability, functionality, application of local skills, and low cost procurement. Remarkably, it was designed and built in just four years.

Post a Review

You need to be logged in to post a review

Recently Viewed