Loading... Please wait...

My basket contains:

0 items £0.00

View Basket

£15.00

Add to basket
Price in Euros €18.66
Price in USD $23.68
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes

  • Format: Stationery

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76429

  • ISBN: 9781907660412

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

The Infrastructure Conditions of Contract: Guidance Notes have been prepared to assist users of this Contract in the preparation of contract documents and the carrying out of contract works. They are comprehensive and explain the differences in the role of the Engineer in the Measurement Version and the role of the Employer's Representative in the Design and Construct Version.

Contents

• Introduction

• Overall Concept

• Choice of design and Construct Contract

• Tendering Procedure

• Award of the Contract

• Operation of the Contract

• Employer's Representative

• Notes on Specific Clauses

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



ICC Infrastructure Conditions of Contract: Design and Construct Version

ICC Infrastructure Conditions of Contract: Design and Construct Version

The Infrastructure Conditions of Contract – Design and Construct Version is not a variant of the Measurement Version but an entirely separate... (more)

£25.00

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes ICC Infrastructure Conditions of Contract: Design and Construct Version

ICC Infrastructure Conditions of Contract: Design and Construct Version

ICC Infrastructure Conditions of Contract: Design and Construct Version

The Infrastructure Conditions of Contract – Design and Construct Version is not a variant of the Measurement Version but an entirely separate... (more)

£25.00

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes ICC Infrastructure Conditions of Contract: Design and Construct Version

JCT 05 Minor Works Building Contract with contractors design MWD: Revision 2 2009

JCT 05 Minor Works Building Contract with contractors design MWD: Revision 2 2009

Please note: this contract is no longer compliant with current legislation following the implementation of Part 8 of the Construction Act on 1... (more)

£20.00

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes JCT 05 Minor Works Building Contract with contractors design MWD: Revision 2 2009

JCT 05 Design and Build Contract DB: Revision 2 2009

JCT 05 Design and Build Contract DB: Revision 2 2009

Please note: this contract is no longer compliant with current legislation following the implementation of Part 8 of the Construction Act on 1... (more)

£42.75

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes JCT 05 Design and Build Contract DB: Revision 2 2009

JCT Design and Build Contract 2011: (DB)

JCT Design and Build Contract 2011: (DB)

Design and Build Contract DB 2011 Appropriate: Where detailed contract provisions are necessary and Employer's Requirements have been prepared... (more)

£44.00

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes JCT Design and Build Contract 2011: (DB)

JCT 05 Minor Works Building Contract MW: Revision 2 2009

JCT 05 Minor Works Building Contract MW: Revision 2 2009

Please note: this contract is no longer compliant with current legislation following the implementation of Part 8 of the Construction Act on 1... (more)

£20.00

Add to basket
ICC Infrastructure Conditions of Contract: Design and Construct Version Guidance Notes JCT 05 Minor Works Building Contract MW: Revision 2 2009

Recently Viewed