My basket contains:

0 items £0.00

View Basket

£33.00

Add to basket
Price in Euros €33.00
Price in USD $33.00
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

ICC Infrastructure Conditions of Contract: Ground Investigation Version

Association of Construction Engineers and Civil Engineering Contractors' Association (CECA)

  • Format: Contract

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76430

  • ISBN: 9781907660436

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

Like the measurement version of the Infrastructure Condition of Contract, the Ground Investigation Version is based on the traditional pattern of an investigation designed by a Engineer and carried out by a Specialist Contractor.

These Conditions are intended for the situration where the Employer wishes to develop a site and has geotechnical specialists to advise him and who will carry out any initial desk study, identify the geotechnical requirements of the project and design a ground investigation to suit those requirements.

The Investigation may include all or some of the following:

• Site operations including drilling, digging pits, surveys etc.

• Ancillary Works, being permanent items left behind, e.g. piezometers.

• Laboratory Testing

• Reporting requirements

The extent of these will vary depending on the needs of individual projects and whether the purpose is for feasibility study of a full design investigation.This new document maintains the concepts set down in the ICE Conditions of Contract Ground Investigation Version, first published in 1983 and updated in 2003.

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



JCT Design and Build Contract 2011: (DB)

JCT Design and Build Contract 2011: (DB)

Design and Build Contract DB 2011 Appropriate: Where detailed contract provisions are necessary and Employer's Requirements have been prepared and... (more)

£70.00

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Design and Build Contract 2011: (DB)

JCT Design and Build Contract 2011: (DB)

JCT Design and Build Contract 2011: (DB)

Design and Build Contract DB 2011 Appropriate: Where detailed contract provisions are necessary and Employer's Requirements have been prepared and... (more)

£70.00

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Design and Build Contract 2011: (DB)

JCT Minor Works Building Contract 2011: (MW)

JCT Minor Works Building Contract 2011: (MW)

**JCT 2016 Edition Available Now** The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A... (more)

£33.41

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Minor Works Building Contract 2011: (MW)

JCT Intermediate Building Contract with Contractor's Design 2011: (ICD)

JCT Intermediate Building Contract with Contractor's Design 2011: (ICD)

Appropriate: Where the proposed building works are of simple content involving the normal, recognised basic trades and skills of the industry... (more)

£62.03

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Intermediate Building Contract with Contractor's Design 2011: (ICD)

JCT Standard Building Contract Without Quantities 2011: (SBC/XQ)

JCT Standard Building Contract Without Quantities 2011: (SBC/XQ)

JCT 2011 Standard Building Contract Without Quantities (SBC/XQ) Appropriate: For larger works designed and/or detailed by or on behalf of the... (more)

£70.00

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Standard Building Contract Without Quantities 2011: (SBC/XQ)

JCT Intermediate Building Contract 2011: (IC)

JCT Intermediate Building Contract 2011: (IC)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£62.03

Add to basket
ICC Infrastructure Conditions of Contract: Ground Investigation Version JCT Intermediate Building Contract 2011: (IC)

Recently Viewed