My basket contains:

0 items £0.00

View Basket

£17.00

Add to basket
Price in Euros €17.00
Price in USD $17.00
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

ICC Infrastructure Conditions of Contract: Partnering Addendum 2011

Association of Construction Engineers and Civil Engineering Contractors' Association (CECA)

  • Format: Contract

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76438

  • ISBN: 9781907660535

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

Like the measurement version of the Infrastructure Condition of Contract, the Ground Investigation Version is based on the traditional pattern of an investigation designed by a Engineer and carried out by a Specialist Contractor.

These Conditions are intended for the situration where the Employer wishes to develop a site and has geotechnical specialists to advise him and who will carry out any initial desk study, identify the geotechnical requirements of the project and design a ground investigation to suit those requirements.

The Investigation may include all or some of the following:

• Site operations including drilling, digging pits, surveys etc.

• Ancillary Works, being permanent items left behind, e.g. piezometers

• Laboratory Testing

• Reporting requirements

The extent of these will vary depending on the needs of individual projects and whether the purpose is for feasibility study of a full design investigation.

This new document maintains the concepts set down in the ICE Conditions of Contract Ground Investigation Version, first published in 1983 and updated in 2003.

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£54.08

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreements are the industry-standard documents for the appointment of consultancy and engineering professionals. In these new 2009 editions of... (more)

£40.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

The JCT Contracts 2016 edition reflects new payment legislation and makes other changes which include: •Incorporating and updating provisions... (more)

£54.08

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

JCT Design and Build Contract 2011: (DB)

JCT Design and Build Contract 2011: (DB)

Design and Build Contract DB 2011 Appropriate: Where detailed contract provisions are necessary and Employer's Requirements have been prepared and... (more)

£70.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 JCT Design and Build Contract 2011: (DB)

Recently Viewed