My basket contains:

0 items £0.00

View Basket

£17.00

Add to basket
Price in Euros €18.84
Price in USD $21.45
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

ICC Infrastructure Conditions of Contract: Partnering Addendum 2011

Association of Construction Engineers and Civil Engineering Contractors' Association (CECA)

  • Format: Contract

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76438

  • ISBN: 9781907660535

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

Like the measurement version of the Infrastructure Condition of Contract, the Ground Investigation Version is based on the traditional pattern of an investigation designed by a Engineer and carried out by a Specialist Contractor.

These Conditions are intended for the situration where the Employer wishes to develop a site and has geotechnical specialists to advise him and who will carry out any initial desk study, identify the geotechnical requirements of the project and design a ground investigation to suit those requirements.

The Investigation may include all or some of the following:

• Site operations including drilling, digging pits, surveys etc.

• Ancillary Works, being permanent items left behind, e.g. piezometers

• Laboratory Testing

• Reporting requirements

The extent of these will vary depending on the needs of individual projects and whether the purpose is for feasibility study of a full design investigation.

This new document maintains the concepts set down in the ICE Conditions of Contract Ground Investigation Version, first published in 1983 and updated in 2003.

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreements are the industry-standard documents for the appointment of consultancy and engineering professionals. In these new 2009 editions of... (more)

£40.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreements are the industry-standard documents for the appointment of consultancy and engineering professionals. In these new 2009 editions of... (more)

£40.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

The JCT Contracts 2016 edition reflects new payment legislation and makes other changes which include: •Incorporating and updating provisions... (more)

£56.78

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

ICC Infrastructure Conditions of Contract: Target Cost Version

ICC Infrastructure Conditions of Contract: Target Cost Version

This publication will help towards delivering construction projects on time by enabling better client-contractor collaboration. The contract allows... (more)

£33.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ICC Infrastructure Conditions of Contract: Target Cost Version

ICC Infrastructure Conditions of Contract: Measurement Version August 2011

ICC Infrastructure Conditions of Contract: Measurement Version August 2011

The Infrastructure Conditions of Contract Measurement Version, which is based on the former ICE Conditions, is a contract form which has become one... (more)

£33.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ICC Infrastructure Conditions of Contract: Measurement Version August 2011

ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

This publication provides guidance to the Infrastructure Conditions of Contract Target Cost Version, which encourages active collaboration to... (more)

£22.00

Add to basket
ICC Infrastructure Conditions of Contract: Partnering Addendum 2011 ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

Recently Viewed