ICC Infrastructure Conditions of Contract: Target Cost Version

Association of Construction Engineers and Civil Engineering Contractors' Association (CECA)

  • Format: Contract

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76434

  • ISBN: 9781907660498

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

This publication will help towards delivering construction projects on time by enabling better client-contractor collaboration. The contract allows the employer, usually with the assistance of the contractor, to set a clear target for the cost of the civil engineering works to be carried out, in order to avoid projects overrunning on cost and deadline.

The contract also encourages the contractor to be more closely involved in the project from an early stage, such as project design, and provides an incentive for the employer and contractor to share profit or loss if the costs differ from the original target.

To utilise the Target Cost Version effectively, a more open style of control and management is required which will permit an early and joint approach to the identification and management of risks. This is intended to lead to better channels of communication between client and contractor, at every project stage.The Target Cost version - the newest member of the Infrastructure Conditions of Contract family – has been produced due to industry demand.

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£54.08

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

This publication provides guidance to the Infrastructure Conditions of Contract Target Cost Version, which encourages active collaboration to... (more)

£22.00

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version ICC Infrastructure Conditions of Contract: Target Cost Version Guidance Notes

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreements are the industry-standard documents for the appointment of consultancy and engineering professionals. In these new 2009 editions of... (more)

£40.00

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ICC Infrastructure Conditions of Contract: Design and Construct Version

ICC Infrastructure Conditions of Contract: Design and Construct Version

The Infrastructure Conditions of Contract – Design and Construct Version is not a variant of the Measurement Version but an entirely separate... (more)

£33.00

Add to basket
ICC Infrastructure Conditions of Contract: Target Cost Version ICC Infrastructure Conditions of Contract: Design and Construct Version

Recently Viewed