My basket contains:

0 items £0.00

View Basket

£33.00

Add to basket
Price in Euros €33.00
Price in USD $33.00
Select your currency
Calculated price

FREE UK Postage for online orders over £60

Terms and conditions apply

ICC Infrastructure Conditions of Contract: Term Version

Association of Construction Engineers and Civil Engineering Contractors' Association (CECA)

  • Format: Contract

  • Publisher: ACE and CECA

  • Date Published: Sep 2011

  • Stock Code: 76436

  • ISBN: 9781907660504

  • Binding: Paperback

Average Rating: Be the first to rate this product!
Your Rating:
Total rating: 0 out of 5
Total votes: 0

Description

The concept of a term contract will be familiar to most engineers and those engaged in the letting and administration of maintenance contracts. Local authorities and utilities have used this type of contract for many years to carry out routine maintenance and remedial work within a set geographical area.

A contractor is appointed to carry out such work for an agreed period of time (the term), carrying out such packages of work as may be required by the Employer under conditions set out in the Contract. The Infrastructure Conditions of Contract Term Version uses Works Orders to accommodate rolling renewal or replacement requirements (based on re-measurement or a lump-sum quotation for a particular operation). The traditional roles of the Engineer in advising the Employer, designing and supervising the Works and certifying payment are all maintained is provided for.

The Infrastructure Conditions of Contract Term Version was drafted bearing in mind the benefits of team working and current procurement initiatives. The Contract will therefore be suitable for planned maintenance or refurbishment work, as well as for emergency works where a contractor may be on call. It may also be suitable for the appointment of a short list of contractors for larger packages of work.

The contract is based on the Term Version of the ICE Conditions of Contract and will be familiar to those who have knowledge of that contract.The payment provision of the contract accommodate the changes required by the Local Democracy, Economic Development and Construction Act 2009. The contract is therefore “Act Compliant” when it provisions came into force on 1 October 2011.

Post a Review

You need to be logged in to post a review

Customers Who Bought This Also Bought



JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Term Version JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£24.74

Add to basket
ICC Infrastructure Conditions of Contract: Term Version JCT Subcontractor Collateral Warranty for an Employer 2011: (SCWa/E)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include: A revised Insolvency definition in the... (more)

£54.08

Add to basket
ICC Infrastructure Conditions of Contract: Term Version JCT Design and Build Subcontract Agreement 2011: (DBSub/A)

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ACE Agreements are the industry-standard documents for the appointment of consultancy and engineering professionals. In these new 2009 editions of... (more)

£40.00

Add to basket
ICC Infrastructure Conditions of Contract: Term Version ACE Agreement 2: Advisory, Investigatory and Other Services 2009 Edition, Second Revision

ICC Infrastructure Conditions of Contract: Term Version Guidance Notes

ICC Infrastructure Conditions of Contract: Term Version Guidance Notes

Guidance Notes have been prepared specifically to assist users of the Infrastructure Conditions of Contract Term Version, in the preparation of... (more)

£22.00

Add to basket
ICC Infrastructure Conditions of Contract: Term Version ICC Infrastructure Conditions of Contract: Term Version Guidance Notes

***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

The JCT Contracts 2016 edition reflects new payment legislation and makes other changes which include: •Incorporating and updating provisions... (more)

£54.08

Add to basket
ICC Infrastructure Conditions of Contract: Term Version ***NEW*** JCT Design & Build Sub-Contract Agreement 2016: (DBSub/A)

Recently Viewed